5
The Committee considered the comprehensive report from the Planning Group Manager.
The Planning Group Manager reported that the site comprised of 2.36 hectares of broiler farm and adjoining agricultural land. The application site was triangular in shape and generally flat. The broiler farm buildings and associated infrastructure were located towards the southern edge of the site with undeveloped land to the north and east. The application was an outline application which included the proposed access off Arcadia Avenue which was accessed via Willow Way off Rollesby Road.
The Planning Group Manager reported that the site was adjacent to the village development limits of Martham and was considered to have good access to a range of facilities. The Highways Authority had indicated that they would not object to the site subject to local improvements and achieving a safe access, which were traffic calming measures, the introduction of a 20 mph zone and a construction management plan. Although the proposed development lied outside the village development limits, the Interim Housing Land Supply Policy stated that developments specifically those for housing outside of the village development limits could be assessed with a view to meeting housing targets prior to the adoption of the site specific allocations. The Core Strategy identified that 30% of new housing development should be located within key service areas or primary villages and Martham was designated as a primary village.
The Planning Group Manager reported that 17 neighbourhood objections to the application had been received. The County Council had reported that there was sufficient capacity at Martham Primary School and Flegg High School so no contributions would be sought for education provision. A contribution would be required for Martham Library and Norfolk Fire Service.
The Planning Group Manager reported that concerns had been raised by objectors and the Parish Council regarding the surface water drainage on the site. Anglain Water had reported that, provided the surface water disposal was not via connection to the public sewer, it would not object.
The Planning Group Manager reported that Natural England had requested information pertaining to a mitigation payment for the impact that the development would have on the Natura 2000 site. It would be conditioned that any relevant Tree Preservation Orders would be served prior to development to ensure that specimens of value were retained.
The Planning Group Manager reported that the application was recommended for approval.
Several Members voiced their concerns regarding the proposed access to the site and possible drainage issues as the local area was prone to flooding. A Member asked if the site had any contamination issues and asked for an assurance that the recommended level of affordable housing units would be provided. A Member was concerned regarding over-development of the site and requested that single storey dwellings be conditioned on the outskirts of the development to prevent overlooking on to the existing bungalows.
A Member requested assurances that the sewerage infrastructure would be in situ before development was commenced. Another Member was concerned that Martham was being targeted by developers and would become a small town rather than a village.
Mr Hartley, applicants agent, reiterated the salient areas of the application and asked that the Committee grant permission for the proposed high quality scheme on the only brownfield site identified in the SHLAA suitable for development.
Mr Bush, an objector, addressed the Committee and reported his concerns regarding access to the site via Acacia Avenue and the blind bend. The increase in vehicular movements could be a safety issue as children often played in the streets and if a delivery lorry was delivering in the area, Maple Close, where he lived would be completely blocked.
Mr Hooper, Parish Councillor, reported that Acacia Avenue was not wide enough to act as the main access to the application site and asked the Committee to condition that the nearby pedestrian crossing be upgraded to a zebra crossing if permission was granted. The Parish Council was concerned that no affordable housing would be provided by the developers and Martham needed affordable housing to allow its children to remain in the village.
Councillor Coleman, Ward Councillor, reiterated that the proposed access via Acadia Avenue and Maple Close was unsuitable and access from the site onto Rollesby Road or Rowan Road was dangerous. The recent number of planning applications in the village was unacceptable as it was piecemeal planning in the absence of a Neighbourhood Plan which would be more beneficial for the village and its community.
A Member asked if the Ward Councillor would prefer the only access to the site to be via the present unmade road which was used at present by farm vehicles. Councillor Coleman reported that this would cause visibility problems for vehicles exiting the site due to the position of an existing bungalow. Councillor Coleman reported that the prosed parking area would not be utilised as people preferred to park outside their homes. However, he did conceded that a 20 mph speed limit and traffic calming measures would be helpful.
A Member stressed the importance of the Council to adopt its Site Specific Plan to prevent similar future planning applications. He was concerned regarding the access to the site and the sewerage implications of the development,to Ormesby, but as the application accorded with the Interim Plan and provided the s106 provision was agreed, he felt that the Committee was in a difficult position and he had no other alternative but to propose the recommendation to grant the application with the agreed conditions as suggested by the officers.
RESOLVED:
That application number 06/15/0673/0 be approved.
It was accepted that the application was outside of the village development limits and contrary to the adopted Borough Wide Local Plan 2001. However, the site had been identified as develop-able and deliverable and there was no objection in planning terms to the development going ahead prior to the formal adoption of the site specific allocations subject to conditions to ensure an adequate form of development and submission of reserved matters. The Interim Housing Land Supply Policy sought to assist in meeting the Local Authorities housing targets and noted that sites that came forward should commence development within two years, it was therefore recommended that the time for the submission of reserved matters is one year from the date of the permission was issued as opposed to the standard three years. With the inclusion of this condition and the submission of reserved matters, the application was in line with the Interim Housing Land Supply Policy (2014).
The application be approved subject to conditions as recommended by consulted parties and those to ensure a satisfactory form of development and obligations as set out by Norfolk County Council and mitigation measures in line with the aims of the Natura 2000 Sites Monitoring and Mitigation Strategy. The recommendation is such that the permission be not issued prior to the signing of an agreement under section 106 for provision for infrastructure, mitigation, affordable housing, children's play equipment/space,Tree Preservation Order and management agreement.